Guangzhou Nansha Sports Center
Facade Curtain Wall System Detailed Design and Material Supply
VIEW PROJECTWe have participated in five medium-to-large-scale stadium projects in China and overseas, including the National Stadium of Tajikistan, Guangzhou Nansha Sports Center, Guinea GLC Stadium, Guangzhou Football Park, and Zhuhai Sports Center Renovation.
Facade Curtain Wall System Detailed Design and Material Supply
VIEW PROJECTFacade Curtain Wall System Detailed Design and Material Supply
VIEW PROJECTWe focus on the perfect integration of terminal functionality and aesthetics, offering comprehensive solutions ranging from process optimization to commercial layout, ensuring both enhanced passenger experience and operational efficiency.
We create high-performance, highly durable airport curtain wall systems that balance rapid construction with unique architectural designs, providing safe and reliable envelope solutions for terminals.
Pain Points:
Obstruction of spectator line of sight, runway slope deviation, poor roof drainage
Solution:
Using 3D laser scanning + BIM verification, with key node errors ≤ 3mm
Pain Points:
Insufficient bearing capacity of existing structure, poor construction feasibility
Solution:
Use of carbon fiber reinforcement technology (improves bending resistance by 40%)
Development of an adjustable support system (accommodates ±15mm on-site deviations)
Pain Points:
Failure in earthquake load transfer
Solution:
Bi-directional sliding bearing dynamic testing (meets 250% displacement requirement)
Installation of dampers (shock absorption efficiency ≥ 35%)
Pain Points:
Water leakage, high wind noise, poor durability
Solution:
Triple waterproofing system (surface coating + sealing adhesive + cavity drainage)
Wind tunnel testing (wind pressure resistance ≥ 5.0 kPa)
Use of fluorocarbon coated aluminum panels (weather resistance ≥ 30 years)
Pain Points:
Seam leakage, material aging
Solution:
Innovative "welding + sealing adhesive" dual waterproofing technique
Use of TPO waterproof membrane (weather resistance ≥ 25 years)
Installation of an intelligent leakage monitoring system (accuracy: 0.1L/min)